Installation Instructions 2010 (left to right, then down)
Click picture to enlarge and show text.
|
1. All loaded up and ready to go to installation site.
|
2. Laying out the first piece.
|
3. Removing a high spot with a shovel.
|
|
|
|
4. Using a grub hoe to remove high spots.
|
5. Lining up the "post and T" to interlock another piece.
|
6. Getting ready to set another piece in place. Notice very little ground preparation is needed.
|
|
|
|
7. Interlocking another piece in place.
|
8. Final positioning of another piece. Notice how piece can be laid right over logging debris so long as its relatively flat.
|
9. Two more pieces ready for installation.
|
|
|
|
10. Another picture showing the interlocking process.
|
11. Close-up of piece being set in place.
|
12. Another picture showing the ground doesn't need extensive preparation.
|
|
|
|
13. Using a rake to smooth out some uneven ground.
|
14. Adding some fill with a shovel so ATV tires have something to run up onto piece more smoothly.
|
15. Getting ready to stake it down using pre-molded stake locations.
|
|
|
|
16. Hammering the stakes in place.
|
17. Another picture of placing the stakes for hammering.
|
18. Every site needs a good foreman!!!
|
|
|
|
19. First test of the new trail.
|
20. Let's Ride!!!
|
|