Rollinsford Installation August 2010
Click picture to enlarge.
|
|
|
|
|
Rollinsford Installation May 2009
Click picture to enlarge.
|
Trail marked and ready for use. May 2009
|
Trail after our rainy weather recently. June 2009
|
Showing how it looks to ride in the rain. June 2009
|
Rollinsford, NH installation April 2009
Click picture to enlarge.
|
Preparing to repair flood damage caused by beaver.
|
Showing depth of ruts before repair work.
|
Moving Eco-Stabilizers back into place.
|
|
|
|
Testing repaired trail.
|
Showing Eco-Stabilizers strength over large ruts.
|
Showing strength of Eco-Stabilizers with traffic over large ruts.
|
|
|